Busted my back putting the transfer case back in. Hooked up the linkages and driveshafts. Cleaned and painted the radiator surround.


The paint dried on the engine/gearbox. Put the transfer case back on.


Fitted the driveshaft and 4 banger mode (hi/low) linkage.


First tool broken. Brendans 14mm spanner.


Bench is finally clean again but suffered some abuse with the gearbox on there.


Radiator surround.


It has rubber pads at the bottom, they were stuffed. Will replace the rubber with some cut radiator hose.


A little help from the wire wheel on the grinder cleaned it up ready for paint.


Fresh paint and it looks like new. Might replace that wire mesh later.


Picked up some sheet metal for holy rust repairs, $10.